Friday, May 11, 2018
NTS&B Remaining 2 station platform roofs designed, built, and installed
When I laid out the passenger yard, I had four removable platform bases that I had planned to cover with roofs. Unfortunately, I had not planned on the subway entrances taking 2 of them. Therefore, I had to make the remaining 2 roofs over the permanently installed platform. This required a different strategy for removal for maintenance. Two of the vertical posts are glued into the platform. The post on the left is removable, and the horizontal piece holding the lights are glued to this post. That makes it possible to remove the post and the lights in one piece.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment