Thursday, March 28, 2013

NTS&B Spring Ceiling Loop almost completed

Finally got all the lights lit, houses wired, trees in, and telephone poles up on the new ceiling loop.  Only things left to do is UNDER the new bridge, and a couple small details above.  Also, most of the ladder work for the layout is finally done.   Am getting closer to the point where I planned to be by last October, but that will probably take another month or 2.   Here's some pictures of the new loop.
Village scene with Kringle's Operating Blimp ride

Raised track for search light car.  Eventually will be illuminating some C130H aircraft flying near the ceiling

Trees along back of track (made from Christmas Garland)

Pine Cone Trees (Idea from Squeekville Raiload in Knoxville)

This Coke billboard was another Christmas present.  (I added the LEDs)