Tuesday, April 19, 2016

NTS&B Phase 5 Power Stations (Last 2) Built And Installed

Finally,  the last 2 power stations have been built and installed.  One is for the outside 2 loops, and the other is for the inside and raised loops.   Here is what they look like.

Freshly built stations.  Middle shelf height is different on outside 2 loops station than other stations



 Outside 2 loops.  Middle shelf set up so can reach accessory transformers more easily,
since they are controlling a variety of Lionel accessories that will need constant adjusting.

Inside and Raised Loops Station

No comments: