Monday, April 11, 2016

NTS&B Phase 5 postwar coal loader and crane flip down control panel

The controls on my old crane and coal loaded had the same size issues as the modern ones.  Therefore, I needed a second flip down shelf near the 2 accessories.  The cables on both accessories had also dried up, so I had to rewire both of them.  I also added a connector under the layout for each of them, for easy removal for maintenance.

Picture with shelf closed.

Picture with shelf open showing Coal Loader and Crane Controls.

No comments: