Friday, November 6, 2015

NTS&B Phase 5 fall raised area town started

Installed and wired the small town on the lift-out section of the raised area.  The light wiring is run over to a barrier strip by the power control station.  There is a 4 pin connector under the lift-out, for easy removal.  I haven't yet installed switches to control the lights, since I have other building and lights to add to the stationary section.  These can not be added until I install the main line track, because I won't know how much clearance I have until then.  Here is what the new town looks like.  The church will be located around the current position, but for now is only temporary.




No comments: