The track work is completed on the Phase 2 (modern / spring) section. Still have to finish wiring in the switch tracks, trim the carpet (ballast), add buildings, etc. I decided to include the third, inside loop. The outside loop has 0-42 curves minimum, the middle loop has 0-34 minimum, and the center loop is 0-27. It has no switches, so will be able to run any Marx or motorized hand cars with no problems.
Monday, January 25, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment