Saturday, January 9, 2010

NTS&B Phase 2 Middle loop almost complete

I finally got some time to play. Phase 2 trackwork for the middle loop is almost completed. Still waiting the arrival of 1 switch track to complete the figure 8 reversing loop. The loop is configured to run as a oval, a figure 8, or as a reversing loop. The decision is still pending about another simple 0-27 inner loop with no sidings for running Marx or other models that won't run through the Lionel style switches. The center portion will eventually contain some MTH and Lionel operating buildings.



No comments: