The ballast (carpet) has been applied to all loops, and the track power permanently connected to the tracks. The track control switches are all installed and connected in their permanent locations. Most of the accessories are in their final locations but not wired in. Trains are running on all tracks, but with some problems to work out yet. Here are the pictures.
Wednesday, August 12, 2015
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment