Sunday, June 21, 2015

NTS&B Phase 5 module Second Loop laid in

The second of 3 loops on this level is now laid in.  It still had a few problems with the switch tracks that need to be worked out.  Accessory clearance continues to be an issue when running the bigger engines and cars, but believe it will all fit.  All of the planned accessories for this area are now out and most are in final position.  None of them are wired in yet.  The train station, beacon light, and Road Runner shack will be moved to the upper level when that is built.  The 2 switch tracks not connected to anything are located approximately where the third loop will be.  Here are some more pictures. A short video is also at the end.







No comments: