The Bigville platform has now been primed and put in position. The mainline track has been permanently installed under Bigville, and temporarily ended. A temporary 0-34 loop was added to the added to the outside mainline, so now continuous operation can occur.
Sunday, June 16, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment