Sep 2008 - Decided that the bridge for the second room crossing should be a different then the suspension bridge used for the first one. This one will be a 'cable stayed' type. This is the first tower up, with one side strung. I am using nylon line, with the plan of adding colored LEDs or wheat bulbs to change colors on the lines (at least that is the plan).
Saturday, September 20, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment