Oct 2007 - Most of the bench work is complete for the subway loops. The outside loop is temporarily laid in and tested. Some of inside loop track is temporarily laid in as well. The track will be a combination of Lionel and Marx. The outside loop will contain Lionel 0-54 and 0-42 curves. The inside loop will be 0-42 and Marx 0-34 curves. There will be no switch tracks on these loops. The loops will be wired with 2 station stops on each loop, with the engines reversing units locked out. The train on one loop will control the train stops on the other loop. There will also be switches wired in to override the stops, for TMCC and conventional train operation. There will be another layer of bench work over most of this track, with only one small section not being covered. The middle of the subway table does not have plywood on it, to allow access to the upper layers.
Saturday, October 27, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment