Sunday, May 2, 2010
NTS&B Tinsel Town Almost Completed
Tinsel Town is almost complete. About only planned tasks are to re-paint, re-letter as Tinsel Town, and add a blinker to the water tower , and add push button switches. All buildings are lit, and have on/off switches at the power control center, but will have push button switches added around the layout at a later date.



Monday, April 26, 2010
NTS&B Tinsel Town Park Completed
The Tinsel Town park is finished. Park has switched Christmas and Street Lights. The 5 white Christmas trees are lit with chasing lights from underneath as seen in the bottom picture. The lights were pulled out of a birthday card, that had flashing candles.

Tuesday, March 30, 2010
NTS&B Phase 2 buildings sneek preview
Here is phase 2, with a couple buildings added in roughly the position they will be in when finished. Shown are 6-22993 LIONEL ROUTE 66 DINOSAUR CAFÉ AND GAS STATION (1999-2000), and 30-9034 MTH RK ORIGINAL 1955 MC DONALDS (2000). The uncoupling / Remote Control track is also connected and operational.

Monday, January 25, 2010
NTS&B Phase 2 Middle loops track complete
The track work is completed on the Phase 2 (modern / spring) section. Still have to finish wiring in the switch tracks, trim the carpet (ballast), add buildings, etc. I decided to include the third, inside loop. The outside loop has 0-42 curves minimum, the middle loop has 0-34 minimum, and the center loop is 0-27. It has no switches, so will be able to run any Marx or motorized hand cars with no problems.

Saturday, January 9, 2010
NTS&B Phase 2 Middle loop almost complete
I finally got some time to play. Phase 2 trackwork for the middle loop is almost completed. Still waiting the arrival of 1 switch track to complete the figure 8 reversing loop. The loop is configured to run as a oval, a figure 8, or as a reversing loop. The decision is still pending about another simple 0-27 inner loop with no sidings for running Marx or other models that won't run through the Lionel style switches. The center portion will eventually contain some MTH and Lionel operating buildings.
Friday, December 25, 2009
NTS&B Merry Christmas 2009
Another year has passed, and the layout is still in process. I'd like to wish everyone a merry Christmas, and happy new years.
Monday, October 19, 2009
NTS & B Phase 2 Mainline Raised Loop Started
A short (app 6 feet long), but critical portion of the mainline track for the Phase 2 section is now complete. The plywood roadbed is suspended on the wall to save space underneath. I decided to use a 3 inch wide piece of plywood for each line instead of 1 (app 11 inch) wide piece, to maximize the view under the track. When the curves are done, they will probably be made out of individual 4 inch pieces for each line.
Now that this section is complete, the inner loops of the lower level can be completed, when track and time is available. The lower level had to wait, to allow access to support the upper level, without having to work over a bunch of track.

Now that this section is complete, the inner loops of the lower level can be completed, when track and time is available. The lower level had to wait, to allow access to support the upper level, without having to work over a bunch of track.
Monday, September 28, 2009
NTS & B Phase 2 First Loop completed
The Hogwarts Express has broken loose, and now has a respectable sized loop of track to run on. The single track around the table looks a little lonely at this time. Due to a shortage of track, the passing siding and inside loop (s) will have to wait until some more can be ordered. The power has also been moved from a shared ZW, to a new ZW, which is approximately in its final location.
Sunday, September 13, 2009
NTS & B Phase 2 ready for track
Finished putting on the legs and painting the Phase 2 tables. Still working on how to add mainline track above it. Thinking about using shelving brackets on the wall to eliminate taking up space on the table. Ready to start laying in the track, but will be delayed a couple weeks due to other commitments.

Monday, September 7, 2009
NTS & B Another Phase 2 table built
The second large module for the Phase 2 section is now complete. The addition is around 8 ft wide by 7 ft deep. The right hand module is framed to allow a large access hole to be cut, after the track is all laid in. Legs have been cut and supporting both modules, but not permanently attached yet. The modules need to be attached together first. The isle down the center is about 2 feet. Still trying to figure out how to support the main line track above these modules, without blocking everything underneath. A problem for another day ....

Subscribe to:
Posts (Atom)