Monday, September 28, 2009
NTS & B Phase 2 First Loop completed
The Hogwarts Express has broken loose, and now has a respectable sized loop of track to run on. The single track around the table looks a little lonely at this time. Due to a shortage of track, the passing siding and inside loop (s) will have to wait until some more can be ordered. The power has also been moved from a shared ZW, to a new ZW, which is approximately in its final location.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment