Saturday, July 16, 2011
NTS&B Mainline progress and another problem solved
The layer between the mainline and winter level is now adjusted, attached and painted. For now, the replacement plaster wall is on hold. A little over 1/2 was ground off the winter table using a belt sander, and now the long car finally has a little clearance (see picture below). A column was added to upport the hanging trestle member and some moss was added by the wall. A panel was finally added to the subway, to give it more of a sense of 2 stations.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgvSid96CS27Sz2PlMte5pPpUlRILxRTGiO1EMvF8G0-5b080AU0y0RuwIDaFGEyfRUNNKz4vxwoK_EV0f1MZlmafo-Qlsaw71c_dKjcSQdTjO8vWf1M97gJ3EYdTV3yTD_m8nXBEYhuqRr/s320/DSC03969.JPG)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment