The Hogwarts Express has broken loose, and now has a respectable sized loop of track to run on. The single track around the table looks a little lonely at this time. Due to a shortage of track, the passing siding and inside loop (s) will have to wait until some more can be ordered. The power has also been moved from a shared ZW, to a new ZW, which is approximately in its final location.
Monday, September 28, 2009
Sunday, September 13, 2009
NTS & B Phase 2 ready for track
Finished putting on the legs and painting the Phase 2 tables. Still working on how to add mainline track above it. Thinking about using shelving brackets on the wall to eliminate taking up space on the table. Ready to start laying in the track, but will be delayed a couple weeks due to other commitments.
Monday, September 7, 2009
NTS & B Another Phase 2 table built
The second large module for the Phase 2 section is now complete. The addition is around 8 ft wide by 7 ft deep. The right hand module is framed to allow a large access hole to be cut, after the track is all laid in. Legs have been cut and supporting both modules, but not permanently attached yet. The modules need to be attached together first. The isle down the center is about 2 feet. Still trying to figure out how to support the main line track above these modules, without blocking everything underneath. A problem for another day ....
Friday, September 4, 2009
NTS & B Year 3, and Phase 2 benchwork started
Year 2 has just ended, already, and now we are headed in year 3. The weather is supposed to be ideal this weekend, so decided to start Phase 2 bench work, instead of working more on Tinsel Town. Phase 2 is 2 tables, and the raised mainline loop. One table is 4 ft wide, 7 ft long on 1 side and angled to 4.1/2 ft long on the other side. The other is 4 ft wide by 7 ft long, with 2 corners cut at an angle. See following sketch and pictures for new overall size and first module.