Tuesday, March 18, 2008

NTS & B North Pole Loop started


March 2008 - Now that the Helix is up, have to give the trains somewheres to go. Started shelfs at door top height. Shelf will go half way down the side of the room, cross the room in the center, then back up the other side, and re-cross the center, and meet up with the inner track of the helix. Shelves are 1 inch boards, notched to overlap for added strength at joints. Corners are 1x12 cut at 45 degrees, and notched to overlap the shelves.
A G-scale shelf layout is planned for the other half of the top of the room.

Friday, March 7, 2008

NTS & B Helix in position

March 2008 - The 2 winter modules are in place and braced, and the Helix is finally positioned on the layout. It only took five of us to get it up there. Top exit just clears the doorway by 1/4 inch :)

Monday, March 3, 2008

NTS & B Post War Loop Started


March 2008 - Finished Post War track under the Mainline Yard. The exposed track is temporary for testing the completed track. This is to make sure there are no problems with it BEFORE it is totally covered with the remaining mainline module.

NTS & B Temp Passenger Yard Layout checks


March 2008 - Laid in temporary track for outside loop to check planned yard clearances. Track will be replaced with Gargraves later.

Saturday, February 23, 2008

NTS & B Second Winter Layer Module Added

Feb 2008 - The second module on the winter layer is complete. One more to go on this layer. Close to being ready for Helix. Model is shown for reference. Also, experimented with foam scenery and tunnel portal on area between subway and mainline levels.


Monday, February 18, 2008

NTS & B FIrst Power Station


Feb 2008 - Instead of having 1 large centrallized control panel, I decided 5 small power stations, positioned at different locations on the layout would be more convienent. That way it would be easier to line up the trains on operating accessories and for troubleshooting problem areas. This is the first of the power station. The Transformer for track control is on the top shelf. The other shelves can contain accessory transfomers, or supplies such as manuals or smoke fluid. Note the Power Control Box discussed earlier on top of the transformer.

NTS & B First Ross Switch Tracks


The first two #4 Ross Custom Switch tracks finally arrive. The top picture shows the passing track leading into the future passenger yard. The lower picture shows the start of the yard. The little blue engine trying out the switche tracks is a Lionel Disney 4x4x0.


Friday, February 8, 2008

NTS & B Winter Layer Mock Up

Feb 2008 - The rest of winter layer level laid is in with cardboard. Checking clearances for Main Line tracks on lower level. Lower picture shows approximate locations of remaining main line tunnels.



Saturday, February 2, 2008

NTS & B Subway Power Module


Feb 2008 - This is the first Power Distribution Module. Each one will have 2 toggle switches to select local transformer power, or Lionel TMCC TPC remote control power for 2 tracks . The TPC will be used to trouble shoot track problems away from the transformer when they arise. The LEDS will indicate when the TMCC is selected. The box will sit above the transformer. When the layout is complete, there will be 5 more of these boxes. The 4 slide switches are used for the Subway Station Stop overrides mentioned in an earlier post.

Saturday, January 5, 2008

NTS & B Winter Layer Started

Jan 2008 - This is the first table created for the winter layer. The helix will be placed on top of this table, and the table next to it that still needs to be built. Table is constructed with notched 1x4s and 1x2s covered by 1/2 inch 4 ply plywood. Additional vertical risers are attached between the bottom layer and 1x4 areas on this layer for additonal strength under the helix. Hope it holds the weight.