Table with access area removed
Friday, October 30, 2015
NTS&B Phase 5 fall raised area tables built and installed
Finally got the plywood, built the tables, and got them painted for the fall raised area. Big cutout in the middle is for a lift-out access area.
Monday, October 5, 2015
NTS&B Phase 5 fall raised area laid in
Hard to believe I'm starting the 9th year working on this.
Making a little progress. Made cardboard prototype of the 2 raised areas with sides and tunnel portals, and laid track above the disappearing loop to make sure it would fit. Here are the pictures.
Making a little progress. Made cardboard prototype of the 2 raised areas with sides and tunnel portals, and laid track above the disappearing loop to make sure it would fit. Here are the pictures.