Wednesday, April 15, 2015
NTS&B Phase 5 module track layout started
I am scrambling to get something running for the train club meeting tomorrow evening. The outside loop is laid in for its final configuration. The sidings in the middle are just temporarily put in to have some place to put spare trains during the meeting. I thought it fitting that the first model Lionel GG1 from 1947 and its cars from 1948-50 make the maiden voyage.
Monday, April 13, 2015
NTS&B Phase 5 modules painted
For my first attempt at putting the final coat of paint on, I used some left over tan paint I had. This resulted in a totally too light finish. I then had to buy a quart of darker brown, which will be the final paint for this section. I used brown, because this will eventually be the fall (autumn) area. I also finished painting the small mainline extension where the light house will be located.
First attempt using tan paint
Final attempt. Blue area will eventually be water feature.
Saturday, April 11, 2015
NTS&B Phase 5 module Work Session
I had some volunteers Thursday and Saturday to help with the layout. Thursday, John L picked up the 3 sheets of plywood to cover the modules. Saturday Paul M and sons came over and we installed the plywood, and primed it. Here are the latest pictures:
New plywood has arrived
Paul Jr. Cutting out the ocean bay
Plywood installed and primed. Center cutout is for future upper and lower levels
Plywood installed and primed-view from end of layout
Friday, April 10, 2015
NTS&B Phase 5 module Track Wiring Laid In
Finally got all of the track wiring laid in from the barrier blocks for the outer 3 loops. Only about 4 of the pairs are connected to the tracks at this time. There will multiple connections on each loop. On the sidings, there is usually a connection on each end. This is to provide insurance that a week pin will not cause power problems in the future. Here are pictures of the block connectors, which will give you an idea on how many wires I have run so far. The loose unlabeled wires are temporary connections. All black wires are to the center rail of the tracks, and the green wires are to the outer (ground) wires. Control Switch and Accessory wiring have not been started.
Monday, April 6, 2015
NTS&B Last Phase 5 module
The last module of the fall layer has now been framed in. Hopefully will get plywood by the end of the week. With this 2x4 module, the overall footprint of the layout has now been laid in. Still lots more work to do. Also, have laid in quit a few track power lines for the outside loop, and established the power blocks for the 2 outside loops. Here are some updated pictures.
Wednesday, April 1, 2015
NTS&B Phase 5-Bay and forth module
The weather has not been cooperating real well this week. Seems that when ever I have a day to work on the layout, it's raining, or rained the previous night so my outside work area is still wet. To make things worse, I offered to have the club meeting here in only 3 more weeks, so I've got to really get going. I did manage to get a couple things done. The first was to get all of the supports in for the bay area. I then applied one of the oldest scenery techniques for making the water. It's commonly know as 'paper water'. It's quick to apply, and doesn't need painting (April Fools !!). I installed the paper so I would have a template to cut out the lake when I finally get the plywood installed. I also get the next 4x8 module framed in. Again, waiting for plywood, but at least I can now continue wiring if it's raining. To make room, most of the 'stuff' that was on the end of the room is now under the layout, with a few more things to cut down to fit.
Bay area supports added, and paper mockup installed.
Another 4x8 module added. Room is getting smaller.
View from other side. The big hole in the middle is where the upper level will be added.
View of overall layout