The Bigville platform has now been primed and put in position. The mainline track has been permanently installed under Bigville, and temporarily ended. A temporary 0-34 loop was added to the added to the outside mainline, so now continuous operation can occur.
Sunday, June 16, 2013
Sunday, June 2, 2013
NTS&B Phase 4 Fall Level underground section complete
The track work, walls, and lights are completed in the lower level. Now I can start on the mainline track and make the Bigville platform. Here are some pictures on what the lower level of the new extension looks like.
Walls and lights installed
Secret Head Quarters
Ready to put the mainline 'lid' down
Mainline benchwork attached
Current Size
Subscribe to:
Posts (Atom)