Sunday, June 16, 2013

NTS&B Phase 4 Bigville platform constructed and mainline track laid in

The Bigville platform has now been primed and put in position.  The mainline track has been permanently installed under Bigville, and temporarily ended.  A temporary 0-34 loop was added to the added to the outside mainline, so now continuous operation can occur. 


Sunday, June 2, 2013

NTS&B Phase 4 Fall Level underground section complete

The track work, walls, and lights are completed in the lower level.  Now I  can start on the mainline track and make the Bigville platform.  Here are some pictures on what the lower level of the new extension looks like.

Walls and lights installed

Secret Head Quarters

Ready to put the mainline 'lid' down

Mainline benchwork attached

Current Size