Here is phase 2, with a couple buildings added in roughly the position they will be in when finished. Shown are 6-22993 LIONEL ROUTE 66 DINOSAUR CAFÉ AND GAS STATION (1999-2000), and 30-9034 MTH RK ORIGINAL 1955 MC DONALDS (2000). The uncoupling / Remote Control track is also connected and operational.
Tuesday, March 30, 2010
Subscribe to:
Posts (Atom)