Sunday, November 4, 2007

NTS & B Mainline benchwork Started


Nov 2007-The benchwork for the second layer is underway. I have called this the mainline layer. It will be a double mainline using Gargraves Track and Ross Custom switches, with the minimum diameter outside loop of 0-72, and inside loop of 0-63. Tables are made with 1x2 frame to minimize distance between layers, covered with 1/2 inch 4 ply plywood. Strength is derived from subway layer due to many vertical risers between this layer and the lower layer.

The half loop on the bottom level is Marx 0-34 track, and will be the start of the loop going into the post war section of the layout.

Saturday, November 3, 2007

NTS & B Flat Albert Inspection

Nov 2007 - Kathy's sisters grandchild in Fla had a school project to send Flat Albert site-seeing. When Flat Albert returned home, he was supposed to report every thing he saw (supplied by Kathy). Here he is checking out my progress on the subway loop. Most of the inner loop is now laid in.